Project Summary Report
  

About

The Project Summary Report plays a key role in your Catena project management tool kit.  It is designed to provide a detailed listing of your key project metrics documenting the base condition, the projected state based on your analysis and the final accomplishments of the project.

The tool has also been designed to include periodic post implementation audits on the same metrics.  This combined with the Audit Score Card provide the discipline and objective view by which to evaluate project outcomes and ensure gains are sustained.  


How To Use

1.   From the Project Panel, click the Sustain tab, and then click the Project Summary Sheet button.

graphic

Catena® will launch Microsoft Excel® and load the Project Summary tool into it.

2.   Click the PROJECT SUMMARY tab to open the Project Summary worksheet.

graphic

3.   Complete header block with decision topic, project name, revision (date) and comments.

graphic

4.   Under Total Direct Project Area FTE’s, add direct staff titles, baseline, projected, and actual FTE counts.

graphic

5.   Under Direct Overtime, enter baseline, projected and actual overtime hours and dollars for direct staff.

graphic

6.   Under Direct Flexibility, rate the degree of Cross Training on a scale from 1 = limited to 5 = maximum for baseline, projected, and actual.

graphic

7.   Under Direct Activity Analysis, enter baseline, projected, and actual results for key Activities.

graphic

8.   Under Indirect Project Area FTE’s, enter titles for clerks, supervisors, managers and other support staff. Also add baseline, projected and actual FTE counts.

graphic

9.   Under Indirect Overtime enter overtime dollars and hours for indirect staff.

graphic

10.             Under Cycle Time, enter baseline, projected, and actual process flow times for selected products/services.

graphic

11.             Under Capacity & Scheduling, enter unit output per total hours paid and hourly capacity for baseline, projected and actual. Also rate degree of Production Control (1 = weak to 5 = strong) and the ability to Schedule (staffing) to Demand (1 = limited to 5 = effectively).

graphic

12.             Under Work in Process (WIP_, enter the number of units or components and the value of them for baseline, projected, and actual.

graphic

13.             Under Floor Space, enter the baseline, projected and actual values for floor space used to produce products/services and for storage and inventory holding areas.

graphic

14.             Under Process Analysis, enter baseline, projected, and actual results from key Process flows.

graphic

15.             Under Change Over Between Shifts, enter baseline, projected, and actual times required to go from one shift to the next.

graphic

16.             Under Change Over Equipment, Machine, and Instrument Change Over, enter internal and external change over minutes for key equipment.

graphic

17.             Under Standard Work, rate the quality of standard work instructions (1 = poor to 5 = excellent). Also rate how well project area is aware of critical quality and safety points.

graphic

18.             Under Data, rate the availability and integrity of operational data (1 = poor to 5 = excellent). Also rate how effectively that data is used in operations (1 = minimally to 5 = highly effective).

graphic

19.             Many of the tables in the Project Summary are composed of multiple items, with ratings. To add more items to a table, click the ‘Add’ button located next to the table.

graphic

Fill out any accompanying windows, and then click OK to add the new rows. (Note: Some of the add buttons will automatically add a single new item, without any prompts or windows).

graphic


graphic

20.             To Print the Project Summary, click the Print button.

graphic

Microsoft Excel® will open the Print Dialog window.

graphic

21.             To Email the Project Summary, click the Email button.

graphic

Microsoft Outlook® will open the new message window. The current Project Summary will be attached.

graphic

22.             In order to sustain the improvements, periodically update this summary using the columns on the right.